Skip to content

Laser-Scanning ASI Sequence #1201

@AdvancedImagingUTSW

Description

@AdvancedImagingUTSW

@jondaniels - For your reference, here is our current workflow.

PLC Control Loop (2).pdf

We hope to get this working with a galvo-based laser-scanning system for @bscott711. One possibility is to get a TTL out from the tggalvo for when it has hit its landmark, which is similar to when we get a trigger from the stage. Most people use some version of the mmspim firmware. Need to decide if the heartbeat is coming from the mmspim card, or from the stages. If from the former, then there are pulses on the backplane to trigger the tgplc.

Brandon's current system: A TG-1000-16 controller operating on micro-manager.

  • TIG/COM
  • 1:X/Y
  • 2:Z (with CRISP)
  • 3:ABCD (Only have AB connected for single galvo, and only one is needed, forget off top of my head which letter)
  • 4:P (with CRISP, O3 is connected on this)
  • 5:F/G (Currently only use F, acts as a tilt adjustment stage)
  • 6:E (1 cam out, 3 global shutter, 5-8 lasers)

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions