List view
GitHub Milestone: List of issues and pull-requests related to error handling Deliverable 12: #1423
Due by December 1, 2026•0/5 issues closedFunctioning new file-handling syntax and refactoring Means of verification: D6 and D7 completed
Due by March 31, 2026•0/7 issues closed- Due by August 1, 2026•0/2 issues closed
Web-Based Catalogue Viewer prototype: can be used to explore local catalogues and offers already filtering functionality Means of verification: A repository for the catalogue viewer exists and the latest version of the main branch supports the described feature
Due by June 30, 2026Means of verification: An issue in GitHub describes the design of access control for the catalogue, after consultation with HIFIS
Due by April 30, 2026Metadata collection: ESM-Tools is capable of collecting the require metadata as defined in D1 and produce a data catalogue, locally, only accessible by the user Means of verification: Feature is tested and merged into the main branch of the repository
Due by April 30, 2026•0/2 issues closed