| A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | AA | AB | AC | AD | AE | AF | AG | AH | AI | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | |||||||||||||||||||||||||||||||||||
2 | PURCHASE REMINDER 2025 | ||||||||||||||||||||||||||||||||||
3 | |||||||||||||||||||||||||||||||||||
4 | No | No PR | Tanggal | Item No | Judul PBJ | Deskribsi | Qty | Harga/ Pcs | Harga Total | Total Biaya | No WO | Update | No PO | No. Receive | Status | ||||||||||||||||||||
5 | 1 | D25/001SEP | 22 Januari 2025 | E-2000133 | Perbaikan blower AHU RO kav 37 | Rewinding Stator | 1 | unit | Rp889.600,00 | Rp889.600 | Rp1.498.000 | DWO24-791857 | Done | OPEN | |||||||||||||||||||||
6 | E-2000133 | Bearing 6202 ZZ | 2 | Pcs | Rp28.000,00 | Rp56.000 | |||||||||||||||||||||||||||||
7 | E-2000133 | Ganti Capasitor 7,5 MF 450 V | 1 | Pcs | Rp150.000,00 | Rp150.000 | |||||||||||||||||||||||||||||
8 | E-2000133 | Ganti Bearing | 1 | Pcs | Rp180.000,00 | Rp180.000 | |||||||||||||||||||||||||||||
9 | E-2000179 | Jasa | 1 | Lot | Rp222.400,00 | Rp222.400 | |||||||||||||||||||||||||||||
10 | |||||||||||||||||||||||||||||||||||
11 | 2 | D25/002SEP | 22 Januari 2025 | E-2000133 | Cleaning RO Skid 1 | Material Chemical Cleaning RO 1 Overton 43 (Low pH cleaner) | 75 | Ltr | Rp50.825,00 | Rp3.811.875 | Rp13.426.000 | DWO24-791864 | Done | OPEN | |||||||||||||||||||||
12 | E-2000133 | Material Chemical Cleaning RO 1 Overton 44 (High pH cleaner) | 75 | Ltr | Rp64.855 | Rp4.864.125 | |||||||||||||||||||||||||||||
13 | E-2000179 | Jasa pekerjn cleaning mesin reverse osmosis per set | 1 | Set | Rp4.750.000 | Rp4.750.000 | |||||||||||||||||||||||||||||
14 | |||||||||||||||||||||||||||||||||||
15 | 3 | D25/003SEP | 22 Januari 2025 | E-2000133 | Cleaning RO Skid 2 | Material Chemical Cleaning RO 1 Overton 43 (Low pH cleaner) | 75 | Ltr | Rp50.825,00 | Rp3.811.875 | Rp13.426.000 | DWO24-791865 | Proses cleaning dilakukan tanggal 23 Januari 2025 | OPEN | |||||||||||||||||||||
16 | E-2000133 | Material Chemical Cleaning RO 1 Overton 44 (High pH cleaner) | 75 | Ltr | Rp64.855 | Rp4.864.125 | |||||||||||||||||||||||||||||
17 | E-2000179 | Jasa pekerjn cleaning mesin reverse osmosis per set | 1 | Set | Rp4.750.000 | Rp4.750.000 | |||||||||||||||||||||||||||||
18 | |||||||||||||||||||||||||||||||||||
19 | 4 | D25/004SEP | 22 Januari 2025 | E-2000133 | Auxiliary Contactor Kaeser | (1SBN010040R1022) CA5-22E CONTACT AUX - ABB | 2 | Unit | Rp351.000,00 | Rp702.000 | Rp1.404.000 | DWO24-791859 | DONE | CLOSE | |||||||||||||||||||||
20 | E-2000133 | (1SBN010040R1022) CA5-22E CONTACT AUX - ABB | 2 | Unit | Rp351.000,00 | Rp702.000 | |||||||||||||||||||||||||||||
21 | |||||||||||||||||||||||||||||||||||
22 | 5 | D25/005SEP | 22 Januari 2025 | E-2000133 | Contactor kompressor sierra 75 kw | Contactor + Auxiliary Contact New Type AX110-30 110V - ABB | 2 | Unit | Rp4.270.312,00 | Rp8.540.624 | Rp8.540.624 | DWO24-795001 | DONE | CLOSE | |||||||||||||||||||||
23 | |||||||||||||||||||||||||||||||||||
24 | 6 | D25/006SEP | 22 Januari 2025 | E-2000133 | Pressure tank pre treatment 1 | Tabung Pompa Grundfos 18 Liter - Pressure Tank Tangki Grundfos GTH-18V | 1 | Set | Rp1.967.000,00 | Rp1.967.000 | Rp1.967.000 | DWO24-794568 | DONE | CLOSE | |||||||||||||||||||||
25 | |||||||||||||||||||||||||||||||||||
26 | 7 | D25/007SEP | 22 Januari 2025 | E-2000133 | Perbaikan kebocoran fitting di ozne 37 dan spare untuk ozone 35 | Fitting elbow SS316 for ozonia | 6 | Set | Rp617.500,00 | Rp3.705.000 | Rp3.705.000 | DWO24-794564 | DONE | CLOSE | |||||||||||||||||||||
27 | |||||||||||||||||||||||||||||||||||
28 | 8 | D25/008SEP | 22 Januari 2025 | E-2000133 | Pengadaan grendel pintu ss 201 | GRENDEL Plat 20" inchi stainless SS201 | 10 | Set | Rp39.200 | Rp392.000 | Rp392.000 | DWO24-794597 | DONE | CLOSE | |||||||||||||||||||||
29 | |||||||||||||||||||||||||||||||||||
30 | 9 | D25/009SEP | 23 Januari 2025 | E-2000133 | Modifikasi Ducting AHU Ruangan Koridor C217 Kelas D | Penggantian Ducting P131, Material BJLS Thickness 0.6mm Insulated Thermobreak 25mm, Supply & Return | 9 | m2 | Rp875.000 | Rp7.875.000 | Rp9.375.000 | DWO24-792296 | DONE | CLOSE | |||||||||||||||||||||
31 | Material Bantu | 1 | Lot | Rp1.500.000 | Rp1.500.000 | ||||||||||||||||||||||||||||||
32 | |||||||||||||||||||||||||||||||||||
33 | 10 | D25/010SEP | 23 Januari 2025 | E-2000133 | Perbaikan Motor blower AHU Cephlopsporin lantai 1 (C121) | Rewinding Stator (Motor Fan K2 0,65 watt 400 V 1,15 Amp 1340 Rpm | 1 | unit | Rp1.422.400 | Rp1.422.400 | Rp3.281.175 | DWO24-791857 | DONE | ||||||||||||||||||||||
34 | E-2000133 | Bearing 6002 ZZ | 2 | Pcs | Rp33.000 | Rp66.000 | |||||||||||||||||||||||||||||
35 | E-2000179 | Jasa | 1 | Lot | Rp355.600 | Rp355.600 | |||||||||||||||||||||||||||||
36 | E-2000133 | Rewinding Stator (Motor Blower 1 Phase 220 V 1350 | 1 | Uit | Rp888.940 | Rp888.940 | |||||||||||||||||||||||||||||
37 | E-2000133 | Bearing 62022 ZZ | 2 | Pcs | Rp38.000 | Rp76.000 | |||||||||||||||||||||||||||||
38 | E-2000133 | Ganti capasitor 14 MF 450 V | 1 | Pcs | Rp250.000 | Rp250.000 | |||||||||||||||||||||||||||||
39 | E-2000179 | Jasa | 1 | Lot | Rp222.235 | Rp222.235 | |||||||||||||||||||||||||||||
40 | |||||||||||||||||||||||||||||||||||
41 | TOTAL PENGELUARAN JANUARI | Rp57.014.799 | |||||||||||||||||||||||||||||||||
42 | |||||||||||||||||||||||||||||||||||
43 | 11 | D25/011SEP | 03 Februari 2025 | E-2000133 | HEPA Filter ruang filling cepha lantai 2 | HEPA Filter Megalam MD14 (1140 x 540 x 66 mm) | 8 | Pcs | Rp3.644.900 | Rp29.159.200 | Rp29.159.200 | DWO24-796582 | Reject | ||||||||||||||||||||||
44 | |||||||||||||||||||||||||||||||||||
45 | 12 | D25/012SEP | 10 Februari 2025 | E-2001133 | Perbaikan CU AHU 3.03 Cepha lantai 3 | Nitrogen & R11 (untuk flushing kondensor, evaporator & pipa instalasi) | 1 | unit | Rp1.100.000 | Rp1.100.000 | Rp5.350.000 | DWO24-797477 | Pekerjaan sudah selesai | ||||||||||||||||||||||
46 | E-2000133 | Fitting, filter dryer & Kapiler | 1 | set | Rp1.250.000 | Rp1.250.000 | |||||||||||||||||||||||||||||
47 | E-2000179 | Jasa pemasangan, commisioning & vacum udara | 1 | lot | Rp2.500.000 | Rp2.500.000 | |||||||||||||||||||||||||||||
48 | E-2000179 | Transportasi | 1 | lot | Rp500.000 | Rp500.000 | |||||||||||||||||||||||||||||
49 | |||||||||||||||||||||||||||||||||||
50 | 13 | D25/013SEP | 12 Februari 2025 | E-2001133 | Kebutuhan Scotch brite untuk pembersihan RO | Scotch Brite 3M, 7447 | 10 | Pcs | Rp20.600 | Rp206.000 | DWO24-798135 | Barang sudah datang | LVD250144 | ||||||||||||||||||||||
51 | E-2001133 | Kebutuhan Lampu Toilet RND | Lampu Downlight LED Panel Philips type, surface mounting (outbow) cahaya kuning | 3 | Pcs | Rp489.000 | Rp1.467.000 | Sudah PO Barang belum datang | LVD250170 | ||||||||||||||||||||||||||
52 | |||||||||||||||||||||||||||||||||||
53 | 14 | D25/014SEP | 12 Februari 2025 | E-2000179 | Perbaikan kompressor sierra 75 kw | Labour Cost (5 Days + 2 Person Service Engineer) | 1 | Pc | Rp24.000.000 | Rp24.000.000 | Rp24.000.000 | DWO24-798231 | Pekerjaan sudah selesai | ||||||||||||||||||||||
54 | |||||||||||||||||||||||||||||||||||
55 | 15 | D25/015SEP | 12 Februari 2025 | E-2001133 | Pengadaan vacum cleaner untuk PM | Vacum cleaner GAS 15 wet & Dry, Merk : BOSCH PN. 0 601 9E5 0K0 | 1 | Pc | Rp4.056.500 | Rp4.056.500 | Rp4.056.500 | DWO24-798232 | Sudah PO Barang belum datang | ||||||||||||||||||||||
56 | |||||||||||||||||||||||||||||||||||
57 | 16 | D25/016SEP | 17 Februari 2025 | E-2001133 | Pengadaan kontaktor untuk penggantian CU Washing cepha lt 2 | Contactor LC1D32M7 | 3 | Pc | Rp743.030 | Rp2.229.090 | Rp5.005.570 | DWO24-797477 | Barang sudah datang | ||||||||||||||||||||||
58 | Overload Rel. 12 A 18A LRD21 | 3 | Pc | Rp422.100 | Rp1.266.300 | Barang sudah datang | |||||||||||||||||||||||||||||
59 | RCP (Relay kontrol phasa) A9E21180 | 1 | PC | Rp1.510.180 | Rp1.510.180 | Barang sudah datang | |||||||||||||||||||||||||||||
60 | |||||||||||||||||||||||||||||||||||
61 | 17 | D25/017SEP | 17 Februari 2025 | E-2001133 | Door closer RND Kav 35 | Alat penutup pintu otomatis 1 x TAFF HOME MO-206 | 1 | Pc | Rp55.000 | Rp55.000 | Rp55.000 | DWO24-798935 | Sudah PO Barang belum datang | LVD250163 | |||||||||||||||||||||
62 | |||||||||||||||||||||||||||||||||||
63 | 18 | D25/018SEP | 17 Februari 2025 | E-2001133 | Leher angsa washtafel | Sifon washtafel, bahan pvc black tidak mudah karat model flexible bisa diatur apabila lubang kurang pas. | 3 | Pc | Rp120.000 | Rp360.000 | Rp360.000 | DWO24-788784 | Barang sudah datang | ||||||||||||||||||||||
64 | |||||||||||||||||||||||||||||||||||
65 | 19 | D25/019SEP | 17 Februari 2025 | E-2001133 | Kebutuhan Upgrade Pre Treatment | PLC SIemenr type : 6ES7212-1BE40-0XB0 | 1 | Pc | 5.500.000 | Rp5.500.000 | Rp5.500.000 | DWO24-794568 | Reject | ||||||||||||||||||||||
66 | |||||||||||||||||||||||||||||||||||
67 | 20 | D25/020SEP | 17 Februari 2025 | E-2001133 | Kebutuhan Upgrade Pre Treatment | HMI CMT2078X, 7" 800x480 TFT LCD LED Backlight, Quad-core RISC CPU-1,5 GHz, 1 GB/4GB UL 4X (indoor), NEMA 4 IP66 | 1 | Pc | 5.200.000 | Rp5.200.000 | Rp5.200.000 | DWO24-794568 | |||||||||||||||||||||||
68 | |||||||||||||||||||||||||||||||||||
69 | 21 | D25/021SEP | 17 Februari 2025 | E-2001133 | HEPA Filter ruang filling cepha lantai 2 | HEPA Filter Megalam MD14 (1140 x 540 x 66 mm) | 3 | Pcs | Rp3.644.900 | Rp10.934.700 | Rp10.934.700 | DWO24-796582 | Barang sudah datang | ||||||||||||||||||||||
70 | |||||||||||||||||||||||||||||||||||
71 | 22 | D25/022SEP | 17 Februari 2025 | E-2001133 | HEPA Filter ruang filling cepha lantai 2 | HEPA Filter Megalam MD14 (1140 x 540 x 66 mm) | 1 | Pcs | Rp3.644.900 | Rp3.644.900 | Rp3.644.900 | DWO24-796582 | Barang sudah datang | ||||||||||||||||||||||
72 | |||||||||||||||||||||||||||||||||||
73 | 23 | D25/023SEP | 17 Februari 2025 | E-2001133 | HEPA Filter ruang Capping cepha lantai 2 | HEPA Filter Megalam MD14 (1140 x 540 x 66 mm) | 2 | Pcs | Rp3.644.900 | Rp7.289.800 | Rp7.289.800 | DWO24-796582 | Barang sudah datang | ||||||||||||||||||||||
74 | |||||||||||||||||||||||||||||||||||
75 | 24 | D25/024SEP | 19 Februari 2025 | E-2001133 | Kebutuhan Upgrade Pre Treatment Quo. 4932678286 Festo | Valve terminal : VTUX-A-P-API-US5M-XL5AXR+H | 1 | Pc | Rp8.161.460 | Rp8.161.460 | Rp8.941.659 | DWO24-794567 | Sudah PO Barang belum datang | ||||||||||||||||||||||
76 | Connect. Cable : NEBC-D8W4-ES-0.5-N-S-D8W4-ET | 1 | Pc | Rp420.054 | Rp420.054 | Sudah PO Barang belum datang | |||||||||||||||||||||||||||||
77 | Connect. Cable : NEBL-M8W4-E-0.5-N-M8W4 | 1 | Pc | Rp360.145 | Rp360.145 | Sudah PO Barang belum datang | |||||||||||||||||||||||||||||
78 | |||||||||||||||||||||||||||||||||||
79 | 25 | D25/025SEP | 19 Februari 2025 | E-2001133 | Kebutuhan Upgrade Pre Treatment Quo. 4932679288 Festo | PN Interface : CPX-AP-I-PN-M12 | 1 | Pc | Rp5.495.202 | Rp5.495.202 | Rp6.396.325 | DWO24-794567 | Sudah PO Barang belum datang | ||||||||||||||||||||||
80 | E-2001133 | Plug : NECU-M-S-D12G4-C2-ET | 1 | Pc | Rp501.769 | Rp501.769 | Sudah PO Barang belum datang | ||||||||||||||||||||||||||||
81 | E-2001133 | Connect. Cable : NEBL-M8W4-E-7.5-N-LE4 | 1 | Pc | Rp329.757 | Rp329.757 | Sudah PO Barang belum datang | ||||||||||||||||||||||||||||
82 | E-2001133 | Cover Cap : ISK-M8 | 1 | Pc | Rp69.597 | Rp69.597 | Sudah PO Barang belum datang | ||||||||||||||||||||||||||||
83 | |||||||||||||||||||||||||||||||||||
84 | 26 | D25/026SEP | 19 Februari 2025 | E-2001133 | Perbaikan CU Washing cepha lt 3 No. 1 Quo. PH 047 | Nitrogen & R11 ( untuk fluishing kondensor , Evapoorator & pipa instalasi) | 1 | unit | Rp1.100.000 | Rp1.100.000 | Rp7.950.000 | DWO24-797477 | Pekerjaan sudah selesai | ||||||||||||||||||||||
85 | E-2001133 | Fitting, filter dryer& kapiler | 1 | set | Rp1.250.000 | Rp1.250.000 | Pekerjaan sudah selesai | ||||||||||||||||||||||||||||
86 | E-2001133 | Gas freon R410 chemoursh | 1 | can | Rp1.750.000 | Rp1.750.000 | Pekerjaan sudah selesai | ||||||||||||||||||||||||||||
87 | E-2001133 | Kontaktor | 1 | pc | Rp850.000 | Rp850.000 | Pekerjaan sudah selesai | ||||||||||||||||||||||||||||
88 | E-2000179 | Jasa pemasangan, commisioning, & vacum udara | 1 | Lot | Rp2.500.000 | Rp2.500.000 | Pekerjaan sudah selesai | ||||||||||||||||||||||||||||
89 | E-2000179 | Transportasi | 1 | Lot | Rp500.000 | Rp500.000 | Pekerjaan sudah selesai | ||||||||||||||||||||||||||||
90 | |||||||||||||||||||||||||||||||||||
91 | 27 | D25/027SEP | 19 Februari 2025 | E-2001133 | Perbaikan CU Washing cepha lt 3 No. 3 Quo. PH 048 | Nitrogen & R11 ( untuk fluishing kondensor , Evapoorator & pipa instalasi) | 1 | unit | Rp1.100.000 | Rp1.100.000 | Rp7.950.000 | DWO24-797477 | Pekerjaan sudah selesai | ||||||||||||||||||||||
92 | E-2001133 | Fitting, filter dryer& kapiler | 1 | set | Rp1.250.000 | Rp1.250.000 | Pekerjaan sudah selesai | ||||||||||||||||||||||||||||
93 | E-2001133 | Gas freon R410 chemoursh | 1 | can | Rp1.750.000 | Rp1.750.000 | Pekerjaan sudah selesai | ||||||||||||||||||||||||||||
94 | E-2001133 | Kontaktor | 1 | pc | Rp850.000 | Rp850.000 | Pekerjaan sudah selesai | ||||||||||||||||||||||||||||
95 | E-2000179 | Jasa pemasangan, commisioning, & vacum udara | 1 | Lot | Rp2.500.000 | Rp2.500.000 | Pekerjaan sudah selesai | ||||||||||||||||||||||||||||
96 | E-2000179 | Transportasi | 1 | Lot | Rp500.000 | Rp500.000 | Pekerjaan sudah selesai | ||||||||||||||||||||||||||||
97 | |||||||||||||||||||||||||||||||||||
98 | 28 | D25/028SEP | 19 Februari 2025 | E-2001133 | Perbaikan CU Washing cepha lt 3 No. 3 Quo. 4990/P/SMM/II/2025 | Rewinding Stator | 1 | unit | Rp1.897.088 | Rp1.897.088 | Rp2.551.360 | DWO24-797477 | Pekerjaan sudah selesai | ||||||||||||||||||||||
99 | E-2001133 | Bearing 6204 ZZ SKF | 2 | Pcs | Rp90.000 | Rp180.000 | Pekerjaan sudah selesai | ||||||||||||||||||||||||||||
100 | E-2000179 | Jasa | 1 | Lot | Rp474.272 | Rp474.272 | Pekerjaan sudah selesai | ||||||||||||||||||||||||||||